WERC Written Report Outline
a. Abstract
II.
Problem
Statement (Task Identification)[Carolina]
a. Project Objectives
b. Deliverables
III.
Impact[Jinhwa]
a. Project Motivation
b. Educational Impact
c. Societal Impact
IV.
Project
Background[Jinhwa]
a. Case Study of Residential Micro-hydroelectric system
V.
Design
Description
a. Project Initialization in Costa Rica
i.
Technical
Progress
1. Dam Construction[Jinhwa]
2. Micro-Hydroelectric System
a. Mechanical System[Sunhwi]
i.
Pipe
Layout
ii.
Securing
Mechanism
iii.
Filter
Design
b. Electrical System [Sam]
i.
Grid tie
System
1. ICE Policy
ii.
PowerSpout
Generator
1. Circuit Board
a. Issues & Resolutions
c. Monitoring System[Ozzie]
i.
Wireless
Monitoring on Web
VI.
Application
of Residential Micro-hydroelectric system in Costa Rica
a. Off-grid system
i.
Technical
aspect[Ozzie]
1. Battery (Mostly DC load)
2. Inverter (Available for more application for AC:
radio, etc.)
ii.
Maintenance[Josh]
1. Battery schedule
2. Skilled Labor (local)
3. Community-based Funding (save money for battery)
4. Reporting & Follow-Up (Coordination with local
universities, etc.)
iii.
Education[Carolina]
1. Educating the community with installed system for taking
ownership
2. Educating technical skill for local skilled labor
3. Forming partnership with local universities or
vocational institutes
4. Generate entrepreneurs
b. Potential Project Sites
VII.
Project
Overview
a. Project Execution
b. Current Status
c. Timeline: Schedule
VIII. Audits*
a. Economics
b. Health & Legal Issues