Day 3. 2. The Big Task








The team built a whole different piping path. The new path has more joints and will have more securing fixed points. However, getting the new path to work was tremendously challenging.



















This is a video that shows the entire pipe path the team constructed. Instead of two large pieces of pipes connecting outlet of the dam to the forest, now several short pieces of pipes and joints deliver water to the forest. There are more supporting from the neighboring rocks. However, getting the right angle and maximizing the water flow at the generator were extremely difficult. 