Each pen mark represents the length of each pipe. Jinhwa did not have paper to write down all the numbers, so she wrote on her arm! The final pipe path of the entire system was about 50 meters long!!!
All the equipment and material are ready for tomorrow's work. (Securing all the pipes!)
No comments:
Post a Comment